![]() |
![]() |
![]() |
For more information: Ph. (641) 322-4220 Fax: (641) 322-3527 / Brown Bear Corporation 2248 Avenue of Industries, PO Box 29, Corning IA 50841 |
|||||
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Hydrostatic Auger Backfiller For Brown Bear 400 & 500
Continuous Ribbon Backfilling The material flows in and around the pipe from the bottom up as the auger rotates into the windrowed spoil which is either trencher or excavator dug. The material is pulverized allowing the fines to enter the trench first with the heavier rocks riding up and entering after the pipe has been entombed and protected. US Federal back filling requirements require pipelines to be fully supported and done in a manner that protects any pipe coating. The auger backfiller satisfies these specifications. |
500 Hydrostatic
500 Hyrdrostatic Videos
|
|||||
Brown Bear Products |
||||||
Copyright Brown Bear Corporation. For more information: Ph. (641) 322-4220 Fax: (641) 322-3527 / 2248 Avenue of Industries, PO Box 29, Corning, IA USA 50841
Professional Website Design, Web Development, Web Hosting provided by Alkon Consulting Group |